Human Resources

Our experienced pipeline construction team excels

Machines

Our specialised equipment is available for use in pipeline construction.

Automatic Welding Systems

  • CNC Programmable
  • Live Data and Recording
  • STT Root Solid Wire
  • Fill and Cap uphill Fluxcore slag
  • Fill and Cap Solid wire downhill pulse
  • Single and double torch
  • Diameter 10“ - ∞, or flat

Bevellers

  • Diameter Range 16“ - 56“ owned
  • Hydraulic and Electric powered Excavator or with separate Hydraulic Power Unit (HPU)
  • V-Bevel 0 – 45° with face
  • J-Preparation 0 – 20° with radius, land and face
  • Tool Holder for all variants

Internal Line-Up Clamps

  • Diameter Range 16“ - 56“ owned
  • Batteryelectric- hydraulic
  • Pneumatic
  • With Remotecontrol
  • Pneumatic conventional

Welding Cabins

Up to 56“. Full Cabins for Automatic Welding

  • Automatic doors
  • Automatic doors
  • Ventilation
  • All to maintain highest quality in welding
  • Half-Cabins for Manual and Tie- In Welding
  • Light and flexible for welding in the trench and bellhole
  • Individually equipped for processes 141,111,136 or combinations with 136 automatic
  • Meeting all regulations and standards, with CE

Paywelder

Welding Tractors/ Paywelders individualized due to requirements

  • Mainline Welding
  • Tie-In Welding

Small, compact, fast Long reach cranes Specially equipped with necessary tools and machines

Other Equipment

  • Tractors with welding equipment
  • Excavators
  • Pipelayers / Sidebooms
  • Trucks
  • Sand Blasting Units
  • Special Pipe Tools

Our Location in Essen (Oldenburg)

Our location in Essen (Oldenburg) combines cutting-edge technology, sustainability, and an ideal logistical position. Conveniently situated on the A1 motorway between Osnabrück and Oldenburg, we are easily accessible.

Sustainable and Modern

With our 300 kW photovoltaic system and in-house hydrogen storage powered by an electrolyzer, we operate completely energy self-sufficiently – making a vital contribution to a greener future.

Optimal Infrastructure

  • Outdoor Area: 20.000 m² for logistics and operations.
  • Facility: 2.000 m² dedicated to maintenance and outfitting of our pipeline equipment.
  • Administration: A team of 20 employees ensures efficient project management.
  • Workshop & Warehouse: State-of-the-art facilities for daily construction needs.

A location that perfectly combines sustainability and efficiency – your reliable base for successful projects.