Moravia Capacity Extension: 85km 40“ Pipeline H²- Ready

Brno, Chzech Republic
03/2022 - 10/2022
HABAU/ PPS Pipeline Systems GmbH
120 workers
100
40" t = 12-13,5mm

Pipe Data

L485ME

Scope of Services

  • 85km Mainline Welding 135/136
  • with 2 Spreads each 5 Paywelder (as PPS)
  • Tie- In Crews 141/111; 141/136 (as Schrand)
  • Station Works (Valve Stations)
85km
KojetínHrušky

Specials

  • Welding on 2 Lots simultaniously
  • Period Main Line Welding 3 Month